Heads up on Lane Closures in the Montlake Interchange Area

WSDOT crews plan to continue geotechnical investigations in the Montlake interchange area in March. The investigations include drilling one hole and conducting geophysical testing along Montlake Boulevard. Work will require the following lane closures:

  • March 14 and 15: Crews will close a portion of the southbound left-turn lane from Montlake Boulevard to East Lake Washington Boulevard for up to two days between 7 a.m. and 10 p.m. Drivers will still be able to use the southbound left-turn lane to access East Lake Washington Boulevard during this work. Both lanes of Montlake Boulevard will be open to traffic.

This fieldwork supports WSDOT moving forward with design work for SR 520 corridor “Rest of the West” improvements between I-5 and Lake Washington. See the flier posted online for more information.

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s